NAVAREA II 250/24
GULF OF GUINEA
WORKS
1. CABLE LAYING OPERATION
BY C/S ILE DE SEIN IN PROGRESS UNTIL FURTHER NOTICE
05-17.30N 000-13.10W
05-30.20N 000-11.90W
WIDE BERTH REQUESTED
2. CANCEL NAVAREA II 243/24
- ADMINISTRATIVE (2,622)
- CABLE OPERATIONS (2,244)
- CANCEL ALERT (36)
- COMMERCIAL SHIPPING (796)
- DISTRESS (2,604)
- GEOPOLITICAL INSTABILITY (796)
- LIGHTHOUSE TOUR (16)
- MAP UPDATE (511)
- MIGRANTS (516)
- MILITARY ACTIVITY (2,106)
- NAVIGATION HAZARD (22,882)
- CONSTRUCTION (118)
- ICEBERGS (2,856)
- OCEAN CLEANUP (264)
- OIL PLATFORMS (3,055)
- PIPELINE OPERATIONS (458)
- PIRATES (16)
- PORT STATUS (148)
- ROCKET LAUNCH (1,592)
- SCIENTIFIC RESEARCH (3,174)
- SEISMIC SURVEY (2,680)
- SITE NEWS (4)
- SPACE DEBRIS (1,218)
- TECHNICAL DIFFICULTIES (2,900)
- TEST (312)
- TSUNAMIS (1)
- UNCATEGORIZED (955)
- UNDERWATER OPERATIONS (632)
- UNUSUAL (2)
- WEATHER (16,964)
- WHALES (1)
CABLESHIP IT INTREPID (119) CABLESHIP RENE DESCARTES (114) DEEP VALUE DRILLER (345) EASTER ISLAND (637) ENSCO DS10 (119) FPSO (751) GLIDER OCEANSCOUT (640) M/V RAMFORM HYPERION (701) M/V RAMFORM TETHYS (989) M/V SANCO SWORD (102) MARION DUFRESNE (92) MODU (534) NOBLE GERRY DE SOUZA (322) NOBLE VENTURER (301) OCEAN BLACKRHINO (213) R/V BGP PROSPECTOR (94) RIGLIST (671) SAVEIROS GAIVOTA (205) space weather (95) VITI LEVU (539)
Cable laying operation ongoing; wide berth requested. Cancel 243/24.
TAGS:
The messages on this site were received via Enhanced Group Call (EGC) service on the Atlantic Ocean Region-East (AOR-E) or Atlantic Ocean Region-West (AOR-W) Inmarsat satellites.