NAVAREA II 190/24
POINTE NOIRE
WORKS
1. CABLE LAYING OPERATION
IN PROGRESS UNTIL FURTHER NOTICE BY C/S ILE DE SEIN
LINE JOINING 05-55.00S 012-10.00E, 05-55.00S 012-08.00E, 05-54.00S 012-05.00E, 05-56.00S 012-01.00E, 05-56.00S 011-54.00E, 05-52.00S 011-40.00E, 05-53.00S 011-37.00E, 05-50.00S 011-23.00E, 05-43.00S 011-15.00E, 05-40.00S 011-06.00E.
WIDE BERTH REQUESTED
2. CANCEL NAVAREA II 183/24
- ADMINISTRATIVE (2,624)
- CABLE OPERATIONS (2,246)
- CANCEL ALERT (36)
- COMMERCIAL SHIPPING (797)
- DISTRESS (2,606)
- GEOPOLITICAL INSTABILITY (797)
- LIGHTHOUSE TOUR (16)
- MAP UPDATE (512)
- MIGRANTS (516)
- MILITARY ACTIVITY (2,109)
- NAVIGATION HAZARD (22,919)
- CONSTRUCTION (119)
- ICEBERGS (2,860)
- OCEAN CLEANUP (264)
- OIL PLATFORMS (3,059)
- PIPELINE OPERATIONS (458)
- PIRATES (16)
- PORT STATUS (148)
- ROCKET LAUNCH (1,593)
- SCIENTIFIC RESEARCH (3,177)
- SEISMIC SURVEY (2,683)
- SITE NEWS (4)
- SPACE DEBRIS (1,219)
- TECHNICAL DIFFICULTIES (2,904)
- TEST (313)
- TSUNAMIS (1)
- UNCATEGORIZED (955)
- UNDERWATER OPERATIONS (632)
- UNUSUAL (2)
- WEATHER (16,977)
- WHALES (1)
CABLESHIP IT INTREPID (119) CABLESHIP RENE DESCARTES (115) DEEP VALUE DRILLER (346) EASTER ISLAND (638) ENSCO DS10 (119) FPSO (753) GLIDER OCEANSCOUT (640) M/V RAMFORM HYPERION (702) M/V RAMFORM TETHYS (990) M/V SANCO SWORD (102) MARION DUFRESNE (92) MODU (535) NOBLE GERRY DE SOUZA (323) NOBLE VENTURER (301) OCEAN BLACKRHINO (213) R/V BGP PROSPECTOR (94) RIGLIST (671) SAVEIROS GAIVOTA (205) space weather (95) VITI LEVU (539)
Cable laying operation ongoing; maintain wide berth. Cancel notice 183/24.
TAGS:
The messages on this site were received via Enhanced Group Call (EGC) service on the Atlantic Ocean Region-East (AOR-E) or Atlantic Ocean Region-West (AOR-W) Inmarsat satellites.