NAVAREA XIX 63/24
1. M/V SW AMUNDSEN AND SW GALLIEN IS CONDUCTING SEISMIC SURVEY OPERATIONS FROM 06 JUNE TO 14 JULY 2024. TOWING 8 SESMIC CABLES AT 2,3NM LENGTH
IN AREA BOUNDED BY:
A. 65-31.0N 007-01.5E
B. 65-22.5N 007-50.1E
C. 65-11.5N 007-39.2E
D. 65-19.4N 006-51.0E
E. 65-31.0N 007-01.5E
2.WIDE BERTH REQUESTED, MINIMUM 3.5NM ASTERN AND 1NM MILES AHEAD AND BOTH SIDES
SUPPORT VESSELS M/V MARIA G AND AMBER G
3.END OF SEISMIC SURVEY: 15 JULY 2024